问题描述:
[单选]
"Standard design capacity is 1000pcs/wk (120hrs/wk), if customer"s volume is 1190pcs/wk, which one is correct?现有的标准设计产能是1000pcs/wk,如果客户需求增加至1190pcs/wk,以下说法正确的是"a. If the period is longer than 1 months, need new standard capacity.如果客户新需求持续超过1个月,则需要重新制定产能"b. If the period is less than or equal to 1 months, need new standard capacity.如果客户新需求持续不足或等于1个月,则需要重新制定产能"c. If the period is longer than 2 months, need new standard capacity.如果客户新需求持续超过2个月,则需要重新制定产能"d. If the period is less than or equal to 2 months, need new standard capacity.如果客户新需求持续不足或等于2个月,则需要重新制定产能"
A.A
B.B
C.C
D.D
参考答案:查看无
答案解析:无
答案解析:无