问题描述:
[单选]
"Which item is not correct about GCSD?下面关于GCSD哪个是错误的"a. We calculate the time based on the drawing我们按照图纸来计算工时"b. Automatic cutting and crimping for cable (cross section < 6mm2)对于面积小于6平方的导线,我们按照自动切线压接来计算"c. For double crimping wires, we consider get wires 1 time and route wires 2 times.并头线 ,我们认为从架子上取1次导线,在工装板上布2次导线"d. We calculate the time based on our actual process我们算工时根据我们的实际的情况来计算"
A.A
B.B
C.C
D.D
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
- 我要回答: 网友(3.19.238.151)
- 热门题目: 1.(2022·北京西城·二模) 2.(2022·天津·二模)汉代 3.(2022·湖南·邵阳市第二