问题描述:
[单选]
Before an auxiliary boiler is shutdown for an extended period of time, the water in the boiler should have a pH value of().
A.10
B.7
C.4
D.1
参考答案:查看无
答案解析:无
☆收藏
答案解析:无
☆收藏
上一篇:The purpose of the delivery check valve used in a diesel fuel injection jerk pump is to().
下一篇:If over a period of weeks the air-box pressure of a turbo-charged, diesel engine, operating at full load, appears to be dropping off, the cause can be().
- 我要回答: 网友(216.73.216.96)
- 热门题目: 1.船舶在营运中,动力装置的维护 2.可靠性对船舶动力装置具有特别 3.对商船动力装置的基本要求是(
